Soft Spots Underfoot
Corrosion has thinned the steel, often near eaves, gutters, and old leak points.
Weak panels are replaced before coating, since coating adds no strength to thin metal.

As an Archbald metal roof coating contractor, we check panel strength, old finishes, and attachment on equipment roofs before deciding whether coating fits.

Archbald metal roof coating requests often come from equipment sheds, shops, and light industrial buildings that have worked hard for decades. Some of those roofs are ready for coating after repairs. Others have thin metal, failing paint, or loose attachment that has to be fixed first, and we say which before pricing.
These conditions decide whether an equipment roof can be coated as planned.
Corrosion has thinned the steel, often near eaves, gutters, and old leak points.
Weak panels are replaced before coating, since coating adds no strength to thin metal.
The original finish has chalked and lost its grip after years of sun.
Loose paint is removed, an adhesion test confirms the base, and a primer suited to the surface is chosen.
Screws have pulled out of rusted or split framing, so panels flex and rattle.
Framing and attachment are repaired and panels are refastened before any coating goes on.
Water has collected below panels near old leaks or condensation points.
We check moisture beneath suspect areas and replace wet material before planning preparation.
Earlier repairs used panels of a different profile, leaving gaps at the side laps.
Mismatched panels are replaced with the right profile, or the laps are closed with matched closures before coating.
Once an Archbald equipment roof passes those checks, coating keeps it working for the machines and people under it.

Sealed laps and screws keep drips off machinery, tools, and stored parts. Fewer drips mean less rust on equipment parked under the panels.
Primer and coating protect panels that are still strong enough to stay in service. Firm panels coated now can stay in service instead of being torn off later.
Coating a firm roof avoids opening the building to weather during a replacement. Machines and stock stay under a closed roof during the whole job.
White coatings keep the roof surface cooler in summer than weathered steel. Cooler panels in summer make the work area under them easier to use.
Archbald equipment roofs usually end up on one of these paths after inspection.
Firm panels with sealed screws and repaired laps take a full metal coating system. Screws and laps are sealed before the base coat.
Thin or holed panels are swapped first, and the whole roof is coated together afterward. Replacement panels match the existing rib profile.
Archbald is part of our regular service area north of Scranton. Inspections cover shops, sheds, and larger plants alike.
Coating plans at about $2.50 to $4.00 per square foot and replacement at about $5 to $8, with panel swaps priced separately. Framing repairs are listed separately as well.
Call us to check the attachment before the next storm. Loose panels come before any coating.
Equipment roofs follow four steps, and the first one decides how much repair comes next.
We check panel thickness and rust, test the old finish, pull suspect screws, and look under the roof where we can. Suspect screws are pulled to check the framing.
Weak panels are replaced, framing at loose screws is repaired, and panels are refastened. Replaced panels match the existing profile.
Flaking paint is scraped and washed off, and rust is primed so the coating grips a firm surface. Washed surfaces dry before primer goes on.
Base and finish coats go on at specified thickness, with extra at laps, screws, and edges. Edges and eaves get the heaviest coverage.
We take roof coating work in Archbald and four other nearby towns. Outside them? Call us or send us a message.
Warehouse roofs with decades of seam repairs to test.
Up-valley buildings where moisture under the panels gets checked first.
Shops and plants with fans, vents, and curbs to flash.
Peeling coatings traced to the cause before recoating.
Answers for Archbald building owners.
Weak metal, an unsuitable old finish, or unreliable attachment. We inspect those and moisture under suspect areas, list any panel or support work first, and coat only a roof that makes a firm base.
A roof that fails those checks gets a repair or replacement plan instead of a coating price.
Start with about $2.50 to $4.00 per square foot to coat and about $5 to $8 to replace. Panel swaps, framing repair, and finish removal are added as separate items.
Those separate items are listed line by line, so you can see which repairs drive the total.
Yes. Small shops and large equipment buildings get the same inspection and repair steps. Smaller buildings often finish in fewer days, with the same written scope and coating checks.
It can when the paint passes an adhesion test. Chalky paint is washed and primed, and flaking paint is removed first. Paint that flakes under tape or a scraper comes off before any primer goes down.
Usually work continues inside. We coordinate around overhead doors and keep debris away from open bays. Bays under the active work area are kept clear, and debris is cleaned up at the end of each day.
Yes. Coating adds a protective film, never strength, so panels that flex underfoot or show rust-through are swapped first. The replacements are listed with the coating proposal, and the whole roof is then coated as one surface.

Get a ballpark range for your Archbald building, or call to have the panels and attachment checked.