Sheets Lifting From The Panels
The coating went on over chalk, dirt, or oil and never gripped the steel.
Loose material comes off, the roof is washed properly, and a test patch confirms the new system grips.

As a Blakely metal roof coating contractor, we find out why an older coating is peeling, remove what has let go, and recoat over a firm surface.
Blakely metal roof coating calls often start with a roof that was coated once and is now peeling in sheets. Another coat on top would only stick to the loose layer. We find out why the first coating let go, how far the failure runs, and what is under it.
Peeling has a cause. These are the ones we find most often.
The coating went on over chalk, dirt, or oil and never gripped the steel.
Loose material comes off, the roof is washed properly, and a test patch confirms the new system grips.
Rust kept growing under a thin coat and pushed it off the metal.
Rust is brushed to firm steel and primed before any new coating covers it.
Standing water softened a water-based coating before or after it cured.
Blistered areas are removed, drainage is checked, and a coating that tolerates water goes where needed.
A coating was applied over a different system that it does not stick to.
We identify the old layers and strip or prime them so the new coating has a compatible base.
Water working in around curbs and vents loosened the coating from below.
Penetrations are reflashed and sealed first, then the coating is rebuilt around them with fabric reinforcement.
Fixing the cause of peeling in Blakely turns a failing coat into a firm one again.

A firm, tested base means the new layer stays attached through freeze-thaw seasons. Seasonal checks then look for new damage instead of old failures.
Primed steel under the new coat keeps rust from pushing the finish off again. Laps and screw heads get extra primer where rust started before.
Checking under peeled areas finds wet spots before they are sealed in. Wet insulation found under peeled areas is replaced first.
A uniform finish replaces the patchy look of a peeling roof. The building looks maintained again from the street and the parking lot.
Peeling roofs in Blakely usually take one of these routes once the cause is known.
Where peeling is limited, loose areas are removed to firm edges and the whole roof is recoated. Feathered edges keep the new coat flat over the old one.
If the old coating fails everywhere or is incompatible, it comes off before a new system goes on. Compatible primer goes on the bare steel first.
Coating plans at about $2.50 to $4.00 per square foot against about $5 to $8 to replace, and removal work adds labor. Stripping adds the most labor on fully failed roofs.
Blakely is close to Scranton and part of our regular service area. The inspection report maps every peeling area.
Call us before anyone rolls another coat over it. We will test the adhesion and check what is underneath.
Recoating a peeling roof follows four steps, starting with the cause.
We test adhesion around peeling areas, check the metal and moisture beneath, and identify the old coating type. Each peeling area is mapped on the roof plan.
Peeling coating is scraped and washed back to a firm edge, and incompatible layers are stripped. Scraped edges are feathered so the new coat lies flat.
Exposed steel is primed, and the remaining old coating gets a primer that bonds to it. Primer choice follows the adhesion results.
New coats go on at specified thickness, with test patches confirming the bond first. Thickness readings are logged for each section.
We coat roofs in Blakely and four towns around it. Building somewhere else? Call us or send us a message.
Warehouse roofs with decades of seam repairs to test.
Up-valley buildings where moisture under the panels gets checked first.
Shops and plants with fans, vents, and curbs to flash.
Equipment roofs where attachment and old finishes decide the plan.
Answers for Blakely property owners.
Only after the adhesion failure is investigated. We check the surrounding finish and metal to see how far preparation must go, so the new surface never depends on loose material or hides corrosion and moisture.
Adhesion tests around each area show where the firm edge begins.
Removal work affects it most. Plan on about $2.50 to $4.00 per square foot to coat and about $5 to $8 to replace, with stripping and priming adding labor. Roofs with limited peeling sit lower in the range than roofs that need a full strip.
We cover Blakely from Scranton and schedule inspections there like any other job in our area. The inspection report lists the peeling areas and what is under them.
Most often it went on over dirt or chalk, over rust, or over an incompatible coating. Ponding water can also soften some coatings. Knowing which cause applies decides how far preparation goes.
A small patch is cleaned, primed, and coated, then pulled after curing to confirm the bond before the full job. Results guide the primer choice for the whole roof.
Often it can. When peeling is limited and the rest of the coating passes adhesion tests, only the failed areas come off. A full strip is saved for roofs where the old coating has let go across most of the surface.

Call to have the peeling areas on your Blakely roof tested, or see a ballpark range online.